General Information
| Completion: | 2000 |
|---|---|
| Status: | in use |
Project Type
| Structure: |
Stressed ribbon bridge |
|---|---|
| Function / usage: |
Pedestrian bridge (footbridge) |
| Material: |
Prestressed concrete bridge |
| Support conditions: |
for registered users |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Grants Pass, Josephine County, Oregon, USA |
|---|---|
| Crosses: |
|
| Coordinates: | 42° 25' 37.87" N 123° 20' 46.93" W |
Technical Information
Dimensions
| sag | max. 1.54 m | |
| span lengths | 73.15 m - 84.73 m - 42.67 m | |
| number of spans | 3 | |
| deck | deck width | 4.27 m |
Cost
| cost of construction | United States dollar 1 320 000 |
Materials
| deck |
precast prestressed concrete
|
|---|
Participants
Owner
Structural engineering
Consulting engineers
- Jiří Stráský (consulting engineer)
- Gary Rayor (consulting engineer)
Main contractor
Precastor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2002): Bridge Builders. Wiley, pp. 92-95.
- About this
data sheet - Structure-ID
20005518 - Published on:
27/09/2002 - Last updated on:
05/02/2016


