General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Stressed ribbon bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Prestressed concrete bridge |
Location
Location: |
Grants Pass, Josephine County, Oregon, USA |
---|---|
Crosses: |
|
Coordinates: | 42° 25' 37.87" N 123° 20' 46.93" W |
Technical Information
Dimensions
sag | max. 1.54 m | |
span lengths | 73.15 m - 84.73 m - 42.67 m | |
number of spans | 3 | |
deck | deck width | 4.27 m |
Cost
cost of construction | United States dollar 1 320 000 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Owner
Structural engineering
Consulting engineers
- Jiří Stráský (consulting engineer)
- Gary Rayor (consulting engineer)
Main contractor
Precastor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Builders. Wiley, pp. 92-95. (2002):
- About this
data sheet - Structure-ID
20005518 - Published on:
27/09/2002 - Last updated on:
05/02/2016