0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Road 1/9 Interchange Bridges

General Information

Beginning of works: 2004
Completion: 2006
Status: in use

Project Type

Location

Location: , ,

Technical Information

Dimensions

standard span lengths 65 - 68 m
pier height max. 37 m

Materials

deck precast prestressed concrete

Notes

The foundations are cast-in-place micropiles with pile caps. The piers are also cast-in-place by the slip-form method while the deck is made of prefabricated box sections.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20045299
  • Published on:
    05/06/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine