General Information
Other name(s): | Riyadh Metro Green Line |
---|---|
Completion: | 5 January 2025 |
Status: | completed |
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 12.9 km | |
number of tracks | 2 | |
number of stations | 12 | |
track gauge | 1 435 mm |
Excerpt from Wikipedia
The Green Line (Arabic: المسار الأخضر) or Line 5 is one of the six lines being developed in the Riyadh Metro network in Riyadh, Saudi Arabia. It will run underground in a tunnel along King Abdulaziz Street, between King Abdul Aziz Historical Center and Riyadh Airbase, before connecting with King Abdullah Road. It includes 11 stations and 2 interchange stations and covers 12.9 km, between Ministry of Education and the National Museum of Saudi Arabia.
It was built by a consortium of FCC, Atkins, Alstom, Samsung C&T, Strukton and TYPSA (Tecnica Y Proyectos).
Text imported from Wikipedia article "Line 5 (Riyadh Metro)" and modified on December 11, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Innovative solutions for intersection of TBM tunnel and station in Riyadh Line 5 metro. In: Tunnelling and Underground Space Technology, v. 80 (October 2018), pp. 26-37. (2018):
- (2016): Line 5 Riyadh Metro Tunnel and Deep Underground Stations. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2703-2710.
- Soluciones innovadoras en el cruce de túneles y estaciones l5 metro Riyadh. Presented at: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017. (2017):
- About this
data sheet - Structure-ID
20089965 - Published on:
09/12/2024 - Last updated on:
09/12/2024