0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Riyadh Metro Yellow Line
Completion: 1 December 2024
Status: in use

Project Type

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

length 29.6 km
number of tracks 2
number of stations 9
track gauge 1 435 mm

Excerpt from Wikipedia

The Yellow Line (Arabic: المسار الأصفر) or Line 4 is one of the Riyadh Metro network in Riyadh, Saudi Arabia. It runs from King Khalid International Airport to the King Abdullah Financial District (KAFD). It has 9 stations and 4 interchange stations, covering 29.6 km.

It was built by a consortium of FCC, Atkins, Alstom, Samsung C&T, Strukton and TYPSA (Tecnica Y Proyectos).

Text imported from Wikipedia article "Line 4 (Riyadh Metro)" and modified on December 11, 2024 according to the CC-BY-SA 4.0 International license.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20089964
  • Published on:
    09/12/2024
  • Last updated on:
    16/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine