General Information
Other name(s): | Riyadh Metro Red Line |
---|---|
Completion: | 5 January 2025 |
Status: | completed |
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 25.3 km | |
number of tracks | 2 | |
number of stations | 14 | |
track gauge | 1 435 mm |
Excerpt from Wikipedia
The Red Line (Arabic: المسار الأحمر) or Line 2 is one of the six lines being developed in the Riyadh Metro network in Riyadh, Saudi Arabia. It will run east–west along King Abdullah Road, between King Saud University and the King Fahd International Stadium. The line will primarily travel on an elevated strip in the median of a planned freeway. There will be 14 stations and 3 interchange stations on the line, covering 25.3 km.
It was built and designed by consortium of Bechtel, Almabani, CCC and Siemens..
Text imported from Wikipedia article "Line 2 (Riyadh Metro)" and modified on December 11, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Puentes de dovelas prefabricadas en el proyecto de viaductos del metro de Riyadh. - líneas 1 & 2. Presented at: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017. (2017):
- About this
data sheet - Structure-ID
20089963 - Published on:
09/12/2024 - Last updated on:
09/12/2024