0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 2007
Completion: 5 June 2008
Status: in use

Project Type

Function / usage: Bicycle and pedestrian bridge
Structure: Through arch bridge
Material: Steel bridge

Location

Location: , , , ,
Crosses:
  • River Cam
Coordinates: 52° 12' 49.12" N    0° 8' 34.77" E
Show coordinates on a map

Technical Information

Dimensions

length 200 m

Cost

cost of construction Pound sterling 1 500 000

Materials

arch steel

Participants

Design
Structural engineering
Geotechnical engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Cam crossing. In: Bridge Update, n. 73 (January 2008), pp. 2.
  • Sweeping solution. In: Bridge Update, n. 76 (June 2008), pp. 4.
  • Debell, Lotte (2004): Winning edge. In: Bridge Update, n. 43 (April 2004), pp. 2.
  • About this
    data sheet
  • Structure-ID
    20011804
  • Published on:
    16/04/2004
  • Last updated on:
    20/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine