0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rippachtal Junction Bridge No. 3/09

General Information

Official designation: BW 03/09
Beginning of works: 1996
Completion: 1997
Duration of works: 20 months
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Autobahn A9
Part of:
Coordinates: 51° 14' 4.88" N    12° 3' 24.45" E
Show coordinates on a map

Technical Information

Dimensions

length 150.00 m
span lengths 32.0 m - 40.0 m - 44.0 m - 34.0 m
clearance 4.80 m
number of spans 4
bridge surface 1 631 m²
deck deck depth 2.35 m
deck width 11.0 m

Quantities

concrete volume 2 529 m³
prestressing steel 36 t
reinforcing steel 268 t

Cost

cost of construction German Mark 3 700 000
cost of construction per m² German Mark 2 288

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20020176
  • Published on:
    21/03/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine