General Information
Official designation: | BW 03/09 |
---|---|
Beginning of works: | 1996 |
Completion: | 1997 |
Duration of works: | 20 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Location
Location: |
Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 51° 14' 4.88" N 12° 3' 24.45" E |
Technical Information
Dimensions
length | 150.00 m | |
span lengths | 32.0 m - 40.0 m - 44.0 m - 34.0 m | |
clearance | 4.80 m | |
number of spans | 4 | |
bridge surface | 1 631 m² | |
deck | deck depth | 2.35 m |
deck width | 11.0 m |
Quantities
concrete volume | 2 529 m³ | |
prestressing steel | 36 t | |
reinforcing steel | 268 t |
Cost
cost of construction | German Mark 3 700 000 | |
cost of construction per m² | German Mark 2 288 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Original design
Structural engineering
Architectural consulting
- Hans-Günther Burkhardt (architectural consultant)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 122-127.
- About this
data sheet - Structure-ID
20020176 - Published on:
21/03/2006 - Last updated on:
05/02/2016