General Information
Official designation: | BW 03/08 |
---|---|
Beginning of works: | 1996 |
Completion: | 1997 |
Duration of works: | 20 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Reinforced concrete bridge |
Location
Location: |
Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 51° 14' 14.60" N 12° 3' 34.17" E |
Technical Information
Dimensions
total length | 81.00 m | |
span lengths | 18.0 m - 2 x 22.5 m - 18.0 m | |
clearance | 4.80 m | |
number of spans | 4 | |
bridge surface | 4 131 m² | |
deck | deck depth | 1.10 m |
deck width | 51.0 m |
Quantities
concrete volume | 5 720 m³ | |
reinforcing steel | 512 t |
Cost
cost of construction | German Mark 6 500 000 | |
cost of construction per m² | German Mark 1 577 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 122-127.
- About this
data sheet - Structure-ID
20020175 - Published on:
21/03/2006 - Last updated on:
05/02/2016