0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: under construction

Project Type

Material: Prestressed concrete bridge
Function / usage: High-speed rail bridge
Structure: Box girder bridge
Material: Structurae Plus/Pro - Subscribe Now!
Construction method: approach viaduct:
Movable Scaffolding System
main span:
Balanced cantilever method

Location

Location: , , ,
Crosses:
  • Urumea River
Part of:
Coordinates: 43° 15' 30.33" N    1° 57' 44.07" W
Coordinates: 43° 15' 4.72" N    1° 57' 53.85" W
Show coordinates on a map

Technical Information

Dimensions

total length 798 m
span lengths 48.00 m - 5 x 59.20 m - 4 x 60.40 m - 62.40 m - 96.00 m - 54.00 m
number of spans 13
horizontal radius of curvature 2 850 m
number of tracks 2
approach viaduct
total length 598 m
deck deck depth 4.20 m
deck width 14.00 m
piers height 18 - 22 m
main bridge
total length 200 m
deck deck depth 4.20 - 6.70 m
deck width 14.00 m
piers height 8 - 11 m

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20075819
  • Published on:
    07/09/2018
  • Last updated on:
    07/09/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine