0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): UEB Center
Beginning of works: 1976
Completion: 1982
Status: in use

Project Type

Location

Location: , ,
Address: Rua Lauro Müller, 116
Coordinates: 22° 57' 26.14" S    43° 10' 33.87" W
Show coordinates on a map

Technical Information

Dimensions

height 168.00 m
number of floors (above ground) 51
office space 270 000 m²

Quantities

volume of extracted material 100 000 m³

Materials

pylons prestressed concrete
truss prestressed concrete
floor slabs prestressed concrete

Chronology

1972

Architectural studies.

1975

Basic architectural project.

1976

Beginning of construction.

1980

10-floor basement shopping center completed.

1982

Tower completed.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003030
  • Published on:
    15/02/2002
  • Last updated on:
    04/10/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine