General Information
Completion: | 2007 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Precast segmental construction using launching gantry |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Boqueixón, La Coruña, Galicia, Spain |
---|---|
Part of: | |
Coordinates: | 42° 49' 38.33" N 8° 27' 13.55" W |
Technical Information
Dimensions
total length | 1 484.8 m | |
span lengths | 46.60 m - 26 x 58.0 m - 46.60 m | |
deck width | 14.0 m | |
number of spans | 28 | |
girder depth | 3.16 - 4.86 m | |
piers | height | max. 70 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Construction engineers
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducto sobre el rio Sáramo (corredor norte-noroeste de alta velocidad). Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- About this
data sheet - Structure-ID
20048588 - Published on:
07/10/2009 - Last updated on:
26/02/2017