General Information
Completion: | 1973 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge Box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
San Pedro De Macoris, San Pedro de Macorís, Dominican Republic |
---|---|
Crosses: |
|
Coordinates: | 18° 27' 17.35" N 69° 19' 2.30" W |
Technical Information
Dimensions
main span | 190 m | |
total length | 380 m | |
deck | girder depth | 1.9 - 9.5 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Proyecto de encofrados y carros de transporte para el hormigónado in situ del puente en voladizo sobre el rio Higuamo (Republica de Santo Domingo). In: Hormigón y acero, v. 21, n. 94-95 (1st Quarter 1970), pp. 245-250. (1970):
- About this
data sheet - Structure-ID
20074851 - Published on:
10/03/2018 - Last updated on:
10/03/2018