General Information
Name in local language: | Ponte Governador Almir Gabriel |
---|---|
Other name(s): | Rio Guamà Bridge |
Beginning of works: | 2000 |
Completion: | October 2002 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Structure: |
Three-span cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 1 930 m | |
number of lanes | 2 | |
main bridge | ||
---|---|---|
total length | 584 m | |
span lengths | 131 m - 320 m - 131 m | |
number of spans | 3 | |
pylons | height | 98.60 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
Chronology
October 2002 | Opened to traffic |
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cable-Stayed Bridge over the Guamà River, Brazil. In: Structural Engineering International, v. 13, n. 3 (August 2003), pp. 171-173. (2003):
- (2010): New Developments in Brazilian Cable Stayed Bridges. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 516-517.
- Il ponte strallato sul Rio Guamà in Brasile. In: Strade e Autostrade, v. 9, n. 52 (July 2005), pp. 110. (2005):
- The Retrofit in Bridges System of Ring Road of the Belém Metropolitan Region - Pará, Brazil. Presented at: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, pp. 308-314.
- About this
data sheet - Structure-ID
20009068 - Published on:
19/04/2003 - Last updated on:
18/05/2018