General Information
Completion: | 2014 |
---|---|
Status: | in use |
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Single-cell box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 250 m | |
width | 26.40 m | |
total length | 930 m | |
height above valley floor or water | 140 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
The Rio Ceira Bridge in Portugal
One of the largest infrastructure projects of the country is currently under construction in the Portuguese region of Pinhal Interior. The two most important axes of this project are the connecting roads between the towns of Tomar and Co ... [more]
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20071340 - Published on:
29/06/2016 - Last updated on:
09/07/2017