0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2001
Completion: 2001
Status: in use

Project Type

Location

Location: , ,
Coordinates: 45° 19' 32.37" N    14° 26' 47.57" E
Show coordinates on a map

Technical Information

Dimensions

height 9 m
span 38 m
deck deck depth 0.65 m
deck width 5 m

Materials

deck steel

Chronology

1997

Studio 3LHD wins the competition's first prize.

November 2000

Project finished.

1 September 2001

Start of construction.

21 December 2001

Bridge is opened.

Participants

Owner
Architecture
Structural engineering
(role unknown)

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001123
  • Published on:
    05/11/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine