0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunel Ribeira do Cidrão I
Official designation: TA27
Completion: 1985
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: ,
Address: ER107
Coordinates: 32° 43' 19.10" N    16° 58' 3.99" W
Show coordinates on a map

Technical Information

Dimensions

length 142 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20076066
  • Published on:
    16/10/2018
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine