General Information
Other name(s): | Graf-von-Arnstein-Brücke |
---|---|
Beginning of works: | 2004 |
Completion: | 2005 |
Duration of works: | 22 months |
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Neuruppin, Ostprignitz-Ruppin, Brandenburg, Germany |
---|---|
Address: | B 167 |
Crosses: |
|
Coordinates: | 52° 56' 49.99" N 12° 50' 43.32" E |
Technical Information
Dimensions
total length | 64 m | |
span lengths | 16 m - 32 m - 16 m | |
number of spans | 3 | |
deck | deck width | 13 m |
roadway / carriageway width | 2 x 3.50 m | |
walkway width | 2 x 2.90 m |
Quantities
concrete volume | 5 000 m³ | |
prestressing steel | 25 t | |
reinforcing steel | 250 t | |
excavated material | 4 500 m³ | |
volume of earthworks | 1 000 m³ |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | Euro 2 300 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Geotechnical/geological experts
Architectural consulting
- Stief (architectural consultant)
Checking engineering
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2007. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-53-8, 2007, pp. 7-20.
- Ersatzneubau der Brücke im Zuge der B 167 über den Rhin in Alt Ruppin. Presented at: 16. Dresdner Brückenbausymposium, Dresden, 14. März 2006. (2006):
- About this
data sheet - Structure-ID
20034770 - Published on:
27/02/2008 - Last updated on:
21/10/2017