General Information
Project Type
Function / usage: |
Commuter rail network |
---|
Location
km | Name |
Technical Information
Dimensions
number of stations | 249 | |
system length | 587 km | |
track gauge | 1 435 mm |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Un chantier dans Paris (Eole). Presented at: AFTES – Paris 25-28 octobre 1999, pp. 143-148. (1999):
- Conception du revêtement extérieur de la gare Magenta Eole - Paris. Presented at: AFTES - Journées d'études, Chambéry, 1996, pp. 269-274. (1996):
- Conception générale des gares souterraines parisiennes du projet EOLE: Magenta, Haussmann Saint-Lazare. General design concept of the Paris underground stations in the EOLE project: Magenta - Haussmann St Lazare. Presented at: First fib Congress, 13-19.10.2002, Osaka, Japan, pp. 73-74. (2002):
- Confrontation entre les résultats des calculs et les mesures de contraintes effectuées sur les tunnels du R.E.R.. Presented at: AFTES - Journées d'études, Paris, 9-11 mai 1977.
- Les contraintes des travaux souterrains en site urbain. Adaptation des méthodes d'exécution lors des récentes utilisations de la RATP. L'architecture des stations souterraines. Presented at: AFTES - Journées d'études, Paris, 9-11 mai 1977, pp. 25-27.
- About this
data sheet - Structure-ID
10058737 - Published on:
01/11/2010 - Last updated on:
24/10/2023