General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
span lengths | 22.7 m - 38.0 m - 33.0 m - 14.7 m | |
number of spans | 4 |
Materials
deck |
prestressed concrete
|
---|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2010): Durable and robust concrete bridges for the PPP-project E18 in Norway. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 770-771.