0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Rauhebergtunnel
Beginning of works: 1983
Completion: December 1987
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , , ,
Part of:
Coordinates: 51° 26' 15.06" N    9° 47' 7.28" E
Coordinates: 51° 24' 35.49" N    9° 43' 31.94" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 5 210 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20005794
  • Published on:
    02/10/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine