General Information
Completion: | 1959 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 75 m | |
span lengths | 11.9 m - 51.2 m - 11.9 m | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering Handbook. CRC Press, Boca Raton (USA), pp. 65-16, 65-18. (1999):
- About this
data sheet - Structure-ID
20005700 - Published on:
01/10/2002 - Last updated on:
30/12/2019