General Information
Completion: | 1914 |
---|---|
Status: | demolished |
Project Type
Structure: |
Suspension bridge |
---|---|
Material: |
Timber bridge |
Function / usage: |
Road bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Manawatū-Whanganui, New Zealand |
---|---|
Crosses: |
|
Coordinates: | 39° 45' 15.65" S 175° 50' 8.03" E |
Technical Information
Materials
pylons |
reinforced concrete
|
---|---|
deck truss |
wood
|
Participants
Design
- S. A. R. Mair (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 203. (2001):
- About this
data sheet - Structure-ID
20024867 - Published on:
07/11/2006 - Last updated on:
16/01/2019