General Information
Name in local language: | สะพานพระราม ๕ (Saphan Phra Ram Ha) |
---|---|
Other name(s): | Wat Nakorn-In Bridge; Chulachomklao Bridge; Chulalongkorn Bridge |
Beginning of works: | 1 November 1999 |
Completion: | 21 June 2002 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
eastern approach viaduct: Precast segmental construction western approach viaduct: In-situ casting on falsework main span: Balanced cantilever method |
Location
Location: |
Nonthaburi, Nonthaburi, Thailand |
---|---|
Crosses: |
|
Coordinates: | 13° 49' 57.30" N 100° 29' 43.41" E |
Technical Information
Dimensions
eastern approach viaduct | ||
---|---|---|
length | 509 m | |
main bridge | ||
main span | 130 m | |
total length | 320 m | |
span lengths | 95 m - 130 m - 95 m | |
number of spans | 3 | |
deck | deck width | 21.10 m |
Quantities
concrete volume | 56 000 m³ | |
prestressing steel | 1 200 t | |
reinforcing steel | 7 500 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Le pont de Wat Nakom In. In: Freyssinet Magazine, n. 208 (July 2000), pp. 7.
- Projet de Wat Nakorn-In. In: Freyssinet Magazine, n. 211 (May - August 2001), pp. 23.
- Wat Nakorn-In Bridge, Bangkok, Thailand. In: Structural Engineering International, v. 12, n. 3 (August 2002), pp. 156-157. (2002):
- About this
data sheet - Structure-ID
20066839 - Published on:
18/02/2015 - Last updated on:
08/06/2023