0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): New Krungthep Bridge
Beginning of works: October 1996
Completion: October 1999
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Structure: Haunched girder bridge
Material: Prestressed concrete bridge

Location

Location: ,
Crosses:
  • Chao Phraya River
Coordinates: 13° 42' 4.68" N    100° 29' 33.15" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 2 170 m
deck deck depth 2.20 - 12.50 m
deck width 23 m
approach viaducts
standard span lengths 35 m, 45 m, 48 m
main bridge
main span 226 m
span lengths 125 m - 226 m - 125 m
number of spans 3

Quantities

concrete volume 75 000 m³

Materials

deck prestressed concrete

Chronology

August 1996

First contracts awarded.

October 1996

Beginning of construction.

October 1999

Construction completed.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20003305
  • Published on:
    20/05/2002
  • Last updated on:
    21/08/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine