General Information
Other name(s): | New Krungthep Bridge |
---|---|
Beginning of works: | October 1996 |
Completion: | October 1999 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Bangkok, Thailand |
---|---|
Crosses: |
|
Coordinates: | 13° 42' 4.68" N 100° 29' 33.15" E |
Technical Information
Dimensions
total length | ca. 2 170 m | |
deck | deck depth | 2.20 - 12.50 m |
deck width | 23 m | |
approach viaducts | ||
---|---|---|
standard span lengths | 35 m, 45 m, 48 m | |
main bridge | ||
main span | 226 m | |
span lengths | 125 m - 226 m - 125 m | |
number of spans | 3 |
Quantities
concrete volume | 75 000 m³ |
Materials
deck |
prestressed concrete
|
---|
Chronology
August 1996 | First contracts awarded. |
---|---|
October 1996 | Beginning of construction. |
October 1999 | Construction completed. |
Participants
Design
Structural engineering
- K. S. Consultant Co. Ltd.
- Norconsult International AS
- Pacific Consultants International
- Span Co. Ltd.
Main contractor
Co-contractor
Prestressing
Relevant Web Sites
- About this
data sheet - Structure-ID
20003305 - Published on:
20/05/2002 - Last updated on:
21/08/2017