0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Raja Isteri Pengiran Anak Hajah Saleha Bridge

General Information

Name in local language: Jambatan Raja Isteri Pengiran Anak Hajah Saleha; Jambatan Sungai Kebun
Other name(s): Sungai Kebun Bridge; RIPAS Bridge
Beginning of works: 13 January 2014
Completion: 14 October 2017
Status: in use

Project Type

Location

Location: ,
Coordinates: 4° 52' 35.53" N    114° 56' 55.57" E
Show coordinates on a map

Technical Information

Dimensions

main span 300 m
total length 622 m
abutments number 2
pylon height 157 m
number 1

Cost

cost of construction 139 000 000

Materials

pylon reinforced concrete
deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20066807
  • Published on:
    07/02/2015
  • Last updated on:
    05/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine