0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: September 2007
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Keelung River
Coordinates: 25° 3' 8.13" N    121° 34' 35.84" E
Show coordinates on a map

Technical Information

Dimensions

width 4.5 m
length 167 m

Cost

cost of construction 110 000 000

Materials

deck steel
piers reinforced concrete
arch steel
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084479
  • Published on:
    14/01/2023
  • Last updated on:
    17/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine