0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2 October 1936
Completion: 15 November 1940
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
, , ,
Underneath of:
  • East River
For:
  • Interstate I-495
Coordinates: 40° 44' 29.34" N    73° 57' 14.30" W
Coordinates: 40° 44' 45.32" N    73° 58' 23.21" W
Show coordinates on a map

Technical Information

Dimensions

tube 1 tunnel length 1 955 m
tube 2 length 1 912 m

Materials

tunnel structure reinforced concrete

Participants

Contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000830
  • Published on:
    24/06/2000
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine