General Information
Completion: | 2015 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Quanzhou, Fujian, China |
---|---|
Coordinates: | 24° 47' 37.66" N 118° 39' 42.27" E |
Coordinates: | 24° 51' 2.02" N 118° 42' 54.38" E |
Technical Information
Dimensions
main bridge | ||
---|---|---|
span lengths | 70 m - 130 m - 400 m - 130 m - 70 m | |
number of cables | 288 | |
number of spans | 5 | |
deck | width | 23.85 m |
pylons | height | 157.1 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
pylons |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2015): A New Solution for Fabrication & Erection of Composite Box Girder of Cable-Stayed Bridge. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 1517-1522.
- About this
data sheet - Structure-ID
20071807 - Published on:
13/10/2016 - Last updated on:
31/10/2016