General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Two-span cable-stayed bridge Cable-stayed bridge with semi-fan system |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Jinan, Shandong, China |
---|---|
Crosses: |
|
Coordinates: | 36° 49' 50.21" N 117° 8' 12.65" E |
Technical Information
Dimensions
width | 40.5 m | |
total length | 4 473.04 m | |
main bridge | ||
---|---|---|
main span | 386 m | |
total length | 666 m | |
span lengths | 60 + 60 + 160 + 386 m | |
deck | deck depth | 3.5 m |
deck width | 43.6 m | |
pylon | height | 197 m |
pylon height (above deck) | 170 m | |
stay cables | length | max. 400.9 m |
number | 96 |
Design Loads
design speed | 120 km/h | |
live load | Highway I |
Cost
cost of construction | Renminbi Yuan 500 000 000 |
Materials
pylon |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
deck of main bridge |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078967 - Published on:
03/01/2020 - Last updated on:
03/01/2020