General Information
Name in local language: | Pont de Pyrimont |
---|---|
Beginning of works: | 1905 |
Completion: | 8 September 1907 |
Status: | demolished (1940) |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Chanay, Ain (01), Auvergne-Rhône-Alpes, France Challonges, Haute-Savoie (74), Auvergne-Rhône-Alpes, France |
---|---|
Crossed: |
|
Coordinates: | 46° 0' 53.87" N 5° 48' 18.43" E |
Technical Information
Dimensions
total length | 200 m | |
span lengths | 25 m - 50 m - 51 m - 25 m | |
number of spans | 4 | |
height above valley floor or water | 47.30 m | |
roadway / carriageway width | 2.20 m (+ 2 x 0.70 m) |
Cost
cost of construction | French Franc 200 000 |
Materials
superstructure |
reinforced concrete
|
---|---|
arches |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'Ain des grands ponts. Editions de la Tour Gile, Peronnas (France), pp. 200. (1993):
- Le relevage du pont de Pyrimont. In: Ossature métallique, v. 12 (October 1947), pp. 409-412.
- About this
data sheet - Structure-ID
20009698 - Published on:
27/07/2003 - Last updated on:
29/03/2020