0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Purple Heart Memorial Bridge

General Information

Completion: 1998
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Red River
Coordinates: 31° 18' 37.98" N    92° 26' 19.63" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 15 900 000

Materials

piers reinforced concrete
deck of main bridge steel
deck of approach viaducts prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20036965
  • Published on:
    02/05/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine