General Information
Name in local language: | Most Mihajla Pupina; Most Zemun - Borča; Пупинов мост |
---|---|
Other name(s): | Zemun-Borča Bridge |
Beginning of works: | October 2011 |
Completion: | 18 December 2014 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 172 m | |
width | 29.1 m | |
total length | 1 507 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- The construction of Zemun Borča Bridge, Belgrade, Serbia. In: The Structural Engineer, v. 92, n. 8 (August 2014), pp. 10-22. (2014):
- Construction of Zemun-Borca Bridge Across Danube and its Approach Roads. Presented at: Eight International Conference on Bridges across the Danube, Timisoara (Romania) and Belgrade (Serbia), October 2013, pp. 529-542. (2014):
- (2015): Research of Performance and Durability of long span prestress concrete box Girder Bridge of gravel concrete. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 120-123.
- About this
data sheet - Structure-ID
20063241 - Published on:
23/06/2012 - Last updated on:
05/02/2016