General Information
Completion: | 1970s |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Rigid frame bridge with V-shaped legs |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Cuenca, Cuenca, Castile-La Mancha, Spain |
---|---|
Crosses: |
|
Coordinates: | 40° 4' 21.61" N 2° 8' 34.59" W |
Technical Information
Dimensions
span lengths | 60 m - 70 m | |
number of spans | 2 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
-
Carlos Fernández Casado S.L.
- Carlos Fernández Casado (designer)
- Javier Manterola (designer)
- Leonardo Fernández Troyano (designer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puente sobre el río Jucar (Cuenca). In: Hormigón y acero, v. 30, n. 130-132 (1st Quarter 1979), pp. 349-353. (1979):
- About this
data sheet - Structure-ID
20076401 - Published on:
23/11/2018 - Last updated on:
23/11/2018