General Information
Other name(s): | Viaducto de Pino |
---|---|
Completion: | 1914 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge Truss arch bridge Two-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Pino del Oro, Zamora, Castile-Leon, Spain |
---|---|
Crosses: |
|
Coordinates: | 41° 33' 38.57" N 6° 7' 46.84" W |
Technical Information
Dimensions
width | 2.5 m | |
length | 190 m | |
height above valley floor or water | 90 m | |
arch | span | 120 m |
Materials
arches |
steel
|
---|---|
piers on arch |
steel
|
Notes
This bridge replaced a big row boat in which up to 10 donkeys could be transported. The last boatmen in 1915 were Eusebio Domínguez and Fernando Pizarro.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducto de Pino. Liviana transparencia. In: Revista del Ministerio de Fomento, n. 531 (July 2004), pp. 64-68. (2004):
- About this
data sheet - Structure-ID
20010017 - Published on:
19/08/2003 - Last updated on:
22/03/2022