0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2020
Completion: 3 March 2024
Status: in use

Project Type

Location

Location: ,
,
Crosses:
  • Paraguay River
Coordinates: 25° 14' 28.32" S    57° 35' 36.70" W
Show coordinates on a map

Technical Information

Dimensions

total length 2 609 m
number of lanes 2 x 2
main bridge
main span 300 m
width 35 m
total length 603 m
span lengths 150 m - 300 m - 150 m
pylons number 2

Cost

cost of construction 789 417 000 000

Materials

deck prestressed concrete
piers reinforced concrete
pylons reinforced concrete
abutments reinforced concrete

Excerpt from Wikipedia

The Héroes del Chaco Bridge (Spanish: Puente Héroes del Chaco) is a cable-stayed bridge in Paraguay that connects the city of Asunción and Nueva Asunción. It crosses the Paraguay River in order to link the Paraguayan eastern and western regions. It was built to help decongest the Remanso Bridge, located eight km upstream. It will be the only large-span bridge in the capital, and the first to link it with the Western Region. It was officially inaugurated by President Santiago Peña on March 3, 2024.

Etymology

Its name is a tribute to the combatants of the Chaco War and was selected through a citizen participation process. The symbolic act of laying the foundation stone took place on 12 June 2020, a date that commemorated the 85th anniversary of the Peace of Chaco, a protocol that ended this war between Bolivia and Paraguay.

History

In December 2019, construction for the Héroes del Chaco Bridge was awarded to the Unión Consortium, made up of the companies CDD Construcciones S.A. and Constructora Heisecke S.A. The groundbreaking ceremony for the work took place on 12 June 2020, on the 85th anniversary of the signing of the Peace of Chaco.

The bridge has a total extension of 7,409 meters, starting from the Costanera de Asunción roundabout to the Nueva Asunción zone, which in turn will connect with Route PY09. It includes the road section of 4,800 meters and the structure section of 2,609 meters (600 meters of cable stays and 2,009 meters of viaduct). The estimated initial execution period was 36 months.

Along with the Nanawa Bridge in Concepción and the Remanso Bridge in Mariano Roque Alonso, they are the only bridges that connect the two regions of Paraguay.

Text imported from Wikipedia article "Héroes del Chaco Bridge" and modified on January 6, 2025 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20090244
  • Published on:
    05/01/2025
  • Last updated on:
    05/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine