General Information
Beginning of works: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Tegucigalpa, Francisco Morazán, Honduras |
---|---|
Coordinates: | 14° 6' 37.65" N 87° 12' 36.47" W |
Technical Information
Materials
deck slab |
prestressed concrete
|
---|---|
girders |
precast prestressed concrete
|
Participants
Consulting engineers
General contractor
Subcontractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Trois ponts ressuscités. In: Freyssinet Magazine, n. 215 (September - December 2002), pp. 17.
- About this
data sheet - Structure-ID
20006531 - Published on:
05/11/2002 - Last updated on:
21/04/2016