General Information
Other name(s): | Puente de Sant Jordi |
---|---|
Beginning of works: | 1925 |
Completion: | 28 March 1928 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Architectural style: |
Art Deco |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Alcoy, Alicante, Valencia, Spain |
---|---|
Crosses: |
|
Coordinates: | 38° 42' 0.69" N 0° 28' 30.99" W |
Technical Information
Dimensions
height | 46.40 m | |
total length | 245 m | |
main spans (3x) | 46 m |
Cost
cost of construction | Spanish peseta 1 336 824 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Excerpt from Wikipedia
The San Jorge Bridge (Pont de Sant Jordi in Valencian, Puente de San Jorge in Spanish), is a bridge located in Alcoy (Alicante), Valencian Community, Spain, crossing the Serpis River.
The style of the bridge is the art déco, is considered to be the most popular image of the city. It is one of the most representative art déco works in the Valencian Community and of the most colossal of this architectural style in Spain.
Architecture
The authors of the bridge were the architect Víctor Eusa and the engineers Carmelo Monzón Reparaz and Vicente Redón. They possessed the collaboration of the civil engineer Alfonso Peña Boeuf during his execution.
The bridge possesses a length of 245 meters and a height of 45,40 meters on the Riquer river. It is placed in Alcoy's city center, communicating the ancient core with the widening that was foreseen to open in the areas known as the Horta Major.
The project of a viaduct was included inside the plans of urban development at the ends of the 19th century, it appears in the year 1876. But the work does not materialize up to the summer of 1923 for concession to the Navarrese company Erroz and San Martín.
The works began in 1925, using reinforced concrete as material and with the own forms of the art déco style. The props are of ashlars and masonry and it possesses four principal supports.
The work was financed by the municipality of Alcoy and it had a budget of 1.336.824 of pesetas and six years of works. It was inaugurated on March 26, 1931.
Text imported from Wikipedia article "San Jorge Bridge" and modified on June 12, 2023 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- (2017): Arquitectura e ingeniería en Alcoy. 90 años del puente de San Jorge. In: Informes de la Construcción, v. 69, n. 545 (March 2017), pp. 186.
- About this
data sheet - Structure-ID
20006156 - Published on:
13/10/2002 - Last updated on:
10/06/2023