0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1908
Completion: 13 June 1909
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Río Manzanares
Coordinates: 40° 25' 28.99" N    3° 43' 36.07" W
Show coordinates on a map

Technical Information

Cost

cost of construction Spanish peseta 441 000

Materials

deck reinforced concrete
piers reinforced concrete
arches reinforced concrete
piers on arch reinforced concrete

Participants

Engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20075479
  • Published on:
    27/06/2018
  • Last updated on:
    28/06/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine