General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Location
Location: |
Litoměřice, Ústí nad Labem Region, Czechia |
---|---|
Address: | D 8 |
Crosses: |
|
Coordinates: | 50° 31' 44.57" N 14° 6' 42.82" E |
Technical Information
Dimensions
total length | 607.90 m | |
length | 585 m | |
span lengths | 64.0 m - 43.0 m - 72.0 m - 90.0 m - 151.0 m - 102.0 m - 60.0 m | |
number of spans | 7 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cantilever debut. In: Bridge Design & Engineering, v. 14, n. 52 (3rd Quarter 2008), pp. 64.
- About this
data sheet - Structure-ID
20043358 - Published on:
03/02/2009 - Last updated on:
05/02/2016