Princess Nora bint Abdul Rahman University Automated People Mover
General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Elevated railroad (railway) |
Material: |
Prestressed concrete bridge |
Location
Location: |
Riyadh, Saudi Arabia |
---|---|
Coordinates: | 24° 50' 50.12" N 46° 43' 20" E |
Technical Information
Dimensions
total length | ca. 12 km | |
deck width | 8.800 m | |
girder depth | 2.250 m |
Quantities
concrete volume | 146 500 m³ | |
prestressing steel | 1 750 t | |
reinforcing steel | 32 000 t |
Design Loads
design speed | 75 km/h |
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia. In: Structural Concrete, v. 14, n. 3 (September 2013), pp. 250-259. (2013):