0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: February 2011
Status: in use

Project Type

Function / usage: Pedestrian bridge (footbridge)
Material: Steel bridge
Structure: U-shaped girder bridge

Location

Location: , , , ,
Coordinates: 51° 23' 9.82" N    0° 31' 44.25" E
Show coordinates on a map

Technical Information

Dimensions

span 13 m

Cost

cost of construction ca. Pound sterling 250 000

Materials

girders steel

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Duguid, Brian / Francis, Nick (2014): A Tale of Two Bridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
  • About this
    data sheet
  • Structure-ID
    20071924
  • Published on:
    21/10/2016
  • Last updated on:
    31/10/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine