0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Fort Amherst Footbridge
Beginning of works: 2010
Completion: 2011
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Pedestrian bridge (footbridge)
Material: Steel bridge

Location

Location: , , , , ,
Coordinates: 51° 23' 10" N    0° 31' 44" E
Show coordinates on a map

Technical Information

Dimensions

main span 25 m
width 2 m

Materials

girders steel
deck flooring glass-fiber-reinforced polymer (GFRP)

Chronology

2011

Institution of Civil Engineers, Kent & East Sussex Branch, Engineering Excellence Awards, Winner of the Structure Award for 2011.

29 April 2011

The bridge is officially opened.

Participants

Design
Structural engineering
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20059485
  • Published on:
    19/03/2011
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine