0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Pretziener Wehr
Beginning of works: 1871
Completion: 1875
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , , ,
Impounds:
  • Elbe River
Coordinates: 52° 2' 22.35" N    11° 49' 41.35" E
Show coordinates on a map

Technical Information

Dimensions

total length 168.5 m
number of openings 9
nominal flow rate 600 m³/s
useable flow width 112.95 m
substructure width 7.5 m
height 3.8 m
length 162.8 m
trestle height 5.75 m
span 12.55 m

Materials

piers sandstone

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20014028
  • Published on:
    08/09/2005
  • Last updated on:
    06/10/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine