General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Steel-concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Schwielowsee, Potsdam-Mittelmark, Brandenburg, Germany |
---|---|
Part of: | |
Coordinates: | 52° 17' 26" N 12° 55' 7" E |
Technical Information
Dimensions
total length | 133.0 m | |
span lengths | 25.0 m - 31.0 m - 42.0 m - 35.0 m | |
number of spans | 4 | |
horizontal radius of curvature | 601.25 m | |
deck | deck depth | 2.20 m |
deck width | 14.50 m | |
roadway / carriageway width | 11.0 m |
Materials
piers |
reinforced concrete
|
---|---|
girder |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Architectural consulting
Checking engineering
-
Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Michael Mündecke (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 29-34.
- About this
data sheet - Structure-ID
20017937 - Published on:
03/10/2005 - Last updated on:
05/02/2016