Port City Footbridge
- (2022): Design Consideration Including Construction Stage Analysis for the Cable Stayed Bridge (FB01-Marina Bridge) in Port City Colombo Project, Sri Lanka. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, pp. 2024-2032.