General Information
Completion: | 1960s |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge Box girder bridge |
Construction method: |
Balanced cantilever method |
Location
Location: |
Longueil-Sainte-Marie, Oise (60), Hauts-de-France, France Pontpoint, Oise (60), Hauts-de-France, France |
---|---|
Crosses: |
|
Part of: | |
Carries: |
A 1 Motorway (France) (1967)
|
Coordinates: | 49° 18' 50.36" N 2° 41' 7.24" E |
Technical Information
Dimensions
main span | 82.50 m | |
span lengths | 17.25 m - 82.50 m - 17.25 m | |
number of spans | 3 | |
deck | deck depth | 1.60 - 4.30 m |
deck width | 14.9 m |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Estudio de las deformaciones por retracción y fluencia en un puente de hormigón pretensado construido por voladizos sucesivos. In: Hormigón y acero, v. 25, n. 113 (4th Quarter 1974), pp. 39-58. (1974):
- About this
data sheet - Structure-ID
20076030 - Published on:
01/10/2018 - Last updated on:
01/10/2018