General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Location
Location: |
Cesena, Forlì-Cesena, Emilia-Romagna, Italy |
---|---|
Is supported by: |
Ponte Nuovo
|
Coordinates: | 44° 8' 22.98" N 12° 14' 6.70" E |
Coordinates: | 44° 8' 22.52" N 12° 14' 6.66" E |
Technical Information
Dimensions
span lengths | 12.9 m - 13.0 m - 12.9 m - 13.0 m - 12.8 m | |
number of spans | 5 | |
Northern bridge | ||
---|---|---|
walkway width | 2.00 m | |
Southern bridge | ||
walkway width | 2.00 m |
Materials
arches |
steel tubes
|
---|---|
deck flooring |
wood
|
piers on arch |
steel tubes
|
main girders |
steel tubes
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Maintenance and Restoration of the Masonry Bridge "Ponte Nuovo" and Construction of two new Steel Footbridges. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072321 - Published on:
23/12/2016 - Last updated on:
04/01/2017