0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1940
Completion: 6 May 1944
Status: in use

Project Type

Structure: Haunched girder bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Replaces: Pont Vell (1911)
Coordinates: 41° 36' 52.66" N    0° 37' 42.24" E
Show coordinates on a map

Technical Information

Dimensions

total length 149 m
span lengths 2 x 47.60 m - 2 x 25 m
number of spans 4
deck deck width 16 m

Materials

superstructure reinforced concrete

Chronology

1940

Construction begins.

6 May 1944

Opening in the presence of Mr. Peña Beuf, ministro de Fomento.

Participants

Engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003201
  • Published on:
    09/03/2002
  • Last updated on:
    05/09/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine