0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 94 B.C.
Status: in ruins (1907)

Project Type

Location

Location: , , ,
Crosses:
  • Segre River
Next to: Pont Vell (1911)

Technical Information

Dimensions

number of spans 5

Materials

piers stone
arches stone

Chronology

1866

A big flood destroys the right part of the bridge, three arches disappear.

18 July 1875

The destroyed part is replaced by a two-span truss bridge, 21.49 m in length, 4.5 m wide + 1.1 m on each side for pedestrians. Cost of reconstruction was 79.989 pesetas.

21 October 1907

Another flood, lasting 4 days, destroys the truss bridge. A completely new bridge was constructed later, leaving the ruins of this one as they were.

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003134
  • Published on:
    21/02/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine