General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-prestressed concrete composite bridge |
Location
Location: |
Courbevoie, Hauts-de-Seine (92), Ile-de-France, France |
---|---|
Part of: | |
Coordinates: | 48° 53' 45.52" N 2° 14' 2.94" E |
Technical Information
Dimensions
span lengths | 19.70 m - 47.65 m | |
number of spans | 2 |
Materials
superstructure |
composite steel-prestressed concrete
|
---|
Chronology
January 2000
— April 2000 |
Construction of the abutments. |
---|---|
March 2000
— July 2000 |
Fabrication of the steel deck in the shop. |
May 2000 | Mounting of the steel deck on site. |
September 2000 | Concreting of the deck slab. |
October 2000 | Assembly of the steel arch. |
November 2000
— January 2001 |
Construction of the superstructure. |
Participants
Owner
Client
Design
-
Setec TPI
- Jean-Bernard Datry (designer)
Architecture
- Brigit de Kosmi (architect)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pont Léonard de Vinci. In: Bulletin ponts métalliques, n. 21 ( 2002), pp. 152-164. (2002):
- About this
data sheet - Structure-ID
20003276 - Published on:
18/05/2002 - Last updated on:
05/02/2016