0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 2001
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 48° 53' 45.52" N    2° 14' 2.94" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 19.70 m - 47.65 m
number of spans 2

Materials

superstructure composite steel-prestressed concrete

Chronology

January 2000
— April 2000

Construction of the abutments.

March 2000
— July 2000

Fabrication of the steel deck in the shop.

May 2000

Mounting of the steel deck on site.

September 2000

Concreting of the deck slab.

October 2000

Assembly of the steel arch.

November 2000
— January 2001

Construction of the superstructure.

Participants

Owner
Client
Design
Architecture

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • de Kosmi, Brigit / Barbier, P. / Prunier, Françoise / Abi Nader, Imad (2002): Pont Léonard de Vinci. In: Bulletin ponts métalliques, n. 21 ( 2002), pp. 152-164.
  • About this
    data sheet
  • Structure-ID
    20003276
  • Published on:
    18/05/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine